Staying in control of Multi-CAD

The full article is available to our Members and registered users. If you are a Member, please sign in to continue reading. If you are not a Member, you can access 1 complimentary article this month by registering for a free account.

Become a Member to access the full range of RINA’s technical publications, articles and professional resources.

About Membership

Content Preview

Shipbuilding programmes are under constant pressure to move faster. Shipyards are expected to evaluate opportunities quickly, reuse proven designs, adapt existing information to local production methods, and begin planning long before every design detail has been finalised.

 

This is especially true when a programme starts with an existing design package, which is becoming more common in naval programmes. In these cases, the shipyard rarely starts with a digital twin built using its own systems and practices. Instead, information arrives in mixed forms: native CAD models, neutral exports, drawings, spreadsheets, equipment lists, supplier documents, classification comments and legacy files, some well-structured, some incomplete or inconsistent.

 

The main challenge is not the use of disparate CAD systems. A single authoring environment may be desirable for long-running programmes, but

Enter email address

Please enter your email address below and click the 'Log On' button.
If you already have a password enter it below.
If you do not have a password or can't remember it, leave it blank and we will email you an authentication code.
1 / 1
100%